Condition assessments of capacitor banks at terminal station

AusNet Services need a visual civil/structural condition inspection of two existing 330kV capacitor banks at South Morang Terminal Station to ensure the safety and…

View case study

500kV underground cable concept design studies and financial modelling

Middleton Group’s client required a feasibility and engineering estimate for the supply, installation, and commissioning of a 500kV underground twin circuit cable system including…

View case study

220kV cable design for Mortlake South wind farm

Acciona required expertise for the design of a 220kV underground feeder cable system connecting the Mortlake South wind farm collector station to the Terrang…

View case study