Solar PV specifications to help Sydney Water achieve their Energy Management & Climate Change objectives

19 March, 2021 | ,

Overview To achieve Sydney Water’s Energy Management and Climate Change goal, Sydney Water have been investigating options to improve their energy efficiency and prepare for…

View case study

Condition assessments of capacitor banks at terminal station

19 March, 2021 |

Overview AusNet Services need a visual civil/structural condition inspection of two existing 330kV capacitor banks at South Morang Terminal Station to ensure the safety and…

View case study

25kV AC auto transformer technical overview for KiwiRail

19 March, 2021 |

Overview Auckland’s population is expected to grow rapidly, with the surrounding infrastructure requiring improvement to support the increasing demand. There are more than 21 million…

View case study

Sydney Trains Electromagnetic Compatibility (EMC) risk assessment

19 March, 2021 |

Overview An audit was undertaken to confirm that Sydney Train’s engineering design processes incorporate Electromagnetic Compatibility (EMC) as per AEO requirements. There was an opportunity…

View case study

Improving safety through power quality assessment on Auckland rail network

19 March, 2021 |

Overview Trains on the 25 kV AC Auckland Metro Rail Network have been experiencing flashover of their pantographs, from the overhead wire to the train’s…

View case study

Southern Cross DC substation design to support future deployment of High Capacity Metro Trains

19 March, 2021 |

Overview As part of Level Crossing Removal Authority (LXRA) program to eliminate Melbourne’s most dangerous and congestive level crossing. A 2x4MW Southern Cross substation was…

View case study

500kV underground cable concept design studies and financial modelling

19 March, 2021 |

Overview Middleton Group’s client required a feasibility and engineering estimate for the supply, installation, and commissioning of a 500kV underground twin circuit cable system including…

View case study

220kV cable design for Mortlake South wind farm

19 March, 2021 |

Overview Acciona required expertise for the design of a 220kV underground feeder cable system connecting the Mortlake South wind farm collector station to the Terrang…

View case study

Functional specification for Cultana Pumped Hydro

23 February, 2021 |

Middleton Group were involved in the optioneering phase of the project through to the tender design for the Cultana Pumped Hydro project.

View case study