Upgrading a motor protection circuit for Sydney Water

The replacement for a 30-year-old motor at Lakemba had modern features that demanded an upgrade to the existing motor protection circuit.

View case study

Switchboard and asset renewal for Eastern Treatment Plant

The Eastern Treatment Plant was commissioned in 1973 and is a core part of the Melbourne Water treatment process. Due to the growth of…

View case study

Solar PV specifications to help Sydney Water achieve its energy management and climate change goals

,

To achieve Sydney Water’s Energy Management and Climate Change goal, Sydney Water have been investigating options to improve their energy efficiency and prepare for…

View case study

Functional specification for Cultana Pumped Hydro

Middleton Group were involved in the optioneering phase of the project through to the tender design for the Cultana Pumped Hydro project.

View case study

Study feasibility of multiple renewable energy sources to reduce South Gippsland Water's carbon emissions

South Gippsland Water (SGW) has pledged to achieve 15% reduction in Greenhouse Gas emissions by 2025 and 100% reduction by 2050. SGW power usage constitutes…

View case study

Risk assessment of Icon Water's high voltage assets

Icon Water owns several high voltage assets across their various sites, many of which are nearing their end of life. Middleton Group was engaged to…

View case study

Upgrade of Melbourne's Western Treatment Plant (WTP) electrical infrastructure

The Western Treatment Plant (WTP) processes 55% of Melbourne's sewerage, approximately 485 ML/day, and the effluent water is treated via both the 25W and 55E…

View case study

Electrical asset renewal at Melbourne Water's Eastern Treatment Plant

Eastern Treatment Plant was commissioned around 1973. Much of the original electrical infrastructure remained in service well beyond normal design service life. This project was…

View case study