Decommissioning of high voltage laboratory whilst meeting relevant legislative obligations

23 February, 2021 |

As part of a department-wide upgrade project of facilities and equipment, Monash University was decommissioning the Jack Wilson High Voltage Laboratory. The laboratory contained HV…

View case study

On-site technical support for Auckland furnace rebuild

23 February, 2021 |

Glass furnaces typically require a rebuild every 10-15 years, whereby the electrical and control infrastructure is upgraded over a shutdown period. O-I Glass needed to…

View case study

Our earthing system experts ensure an existing defence system adheres to Australia Standards

23 February, 2021 |

Middleton Group was engaged by the Client to conduct work on an existing earthing system at a Defence facility. The project required a safety and…

View case study

Energy cost optimisation and connection study

23 February, 2021 |

As a means to reduce their electricity costs, GSK was interested in commissioning a generator on their site to supplement their peak usage during the…

View case study

Improving the operator safety of the system through arc flash hazard analysis

23 February, 2021 |

In order to enhance the identification and management of arc flash related risks to switchboard operators, it is imperative to undertake arc flash hazard analysis.

View case study